Customer Case Studies

Learn how our clients are saving time and money with Vertex BD.

 

 

 

 

Join Our Mailing ListWatch Customer Videos

Latest Stories

Machiels Building Solutions

Machiels Building Solutions

Learn how Machiels built 400 homes in 200 working days using prefabricated construction methods to create the structures as efficiently as possible.

Arkitech

Arkitech

With more than 15 years of experience in the field of light steel processing, a comprehensive solution has been developed to ensure very accurate and reliable production processes. The Arkitech system guarantees lower costs than traditional construction methods.

KVR-Engineers

KVR-Engineers

Learn how faster design process has allowed KVR-Engineers to grow, taking on more clients and providing faster turnaround times for existing clients.

Statistics from 35 Framing Projects

Statistics from 35 Framing Projects

Statistics from 35 projects in Norway show that it is possible to complete almost any framing design project in an average of 16 hours or about two working days.

ACE Arheget

ACE Arheget

Customer satisfaction has increased through having fewer problems at the site, and being able to offer more precise end results to the customer.

Xiamen Xinhonghua Machinery

Xiamen Xinhonghua Machinery

“New entrants now find it more convenient to learn about the whole procedure of light steel frame construction —­ from how to design a building using light steel frame structure design software, how to produce the light steel frames with our machine, and how to assemble them together according to drawings.”

DEN Finland

DEN Finland

From the beginning, Den Finland has invested in standardisation of design and production. The company performs well year after year and operates profitably.

Samesor

Samesor

“By connecting the most versatile manufacturing equipment with a BIM software, builders will boost production capacity and improve speed and accuracy. Building projects will be completed faster and without mistakes.”

BATI-FABLAB by CIOA

BATI-FABLAB by CIOA

Bringing people together with Cold-Formed Steel to solve a global lack of housing.

Steel Framing

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Wood Framing

Berks Homes

Berks Homes

“The company is also saving hours of drafting time while producing high quality field sets.”

Woodtec Australia

Woodtec Australia

“Automated connection details, which generate the floor system according to the construction method the builder prefers, are brilliant.”

Optimera

Optimera

“Thanks to Vertex, we save money in the production and time in transferring machining files directly to the saw.”

Winchester Homes

Winchester Homes

“The Vertex system saves us over 50% of design time and cost compared to previous methods.”

Manufacturing Equipment

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

× Shopping Cart

Your cart is empty.