by Pekka Moilanen | Feb 21, 2020 | Case Study, Commercial Construction, Featured Case Study, Wood Framing
Ursem Sets Record with the Netherlands’ Tallest Modular Building: The FIZZ Spartaan Amsterdam West Across the world, modular construction is starting to make its mark —and it’s easy to see why. Case Study Client: Ursem Modulaire Bouwsystemen Date:...
by Pekka Moilanen | Feb 3, 2020 | Blog Post, Featured Post
Prefab Systems + BIM — a Winning Combination To truly appreciate prefab construction and all its benefits, you have to understand how prefab structures come together. Blog Post February 2020 Pekka Moilanen In the broadest terms, prefab (or modular) construction...
by Pekka Moilanen | Dec 19, 2019 | Blog Post
The Power of Prefab to Increase Efficiency and Save Money – Part 2 Special Series: Prefab + BIM: How Two Innovations are Changing the Face of Construction. In our last blog, we discussed how modern prefabricated construction (aka modular construction or prefab...
by Pekka Moilanen | Nov 20, 2019 | Blog Post, News
Brisbane-based Australian Institute of Advanced Studies to offer Vertex BD training as part of their engineering curriculum News November 2019 Australia During the spring, the Australian Institute of Advanced Studies (AUS-IAS) and Vertex Australia have trialled a...
by Pekka Moilanen | Nov 19, 2019 | Case Study, Commercial Construction, Residential Construction, Wood Framing
Sage Building Components’ Pre-Cut Process Decreases Framing Time by 25% As a long-time framing contractor, Sage Building Components (SBC) understands the importance of traditional craftsmanship — and the innovations needed to be as efficient as possible in...
Recent Comments