by Pekka Moilanen | Jun 30, 2023 | Blog Post
DfMA: Why Manufacturing Is the Key to Viability — Blog 5: New Horizons for DfMA The distant future of design for manufacturing and assembly (DfMA) will be fascinating as several emerging technologies penetrate further into the industry and converge in design...
by Pekka Moilanen | Jun 19, 2023 | Blog Post
DfMA: Why Manufacturing Is the Key to Viability — Blog 4: New Principles for Scalability In my previous blog, I discussed the rise and fall of Katerra and presented several observations about what went wrong. For this fourth installment of my blog series about...
by Pekka Moilanen | May 5, 2023 | Blog Post
DfMA: Why Manufacturing Is the Key to Viability — Blog 3: Katerra and Lessons Learned The rise and fall of Katerra, which burned through more than $2 billion in just six years, is the most discussed story related to DfMA in decades. Blog Post May 2023 Pekka...
by Pekka Moilanen | Apr 20, 2023 | Blog Post
DfMA: Why Manufacturing Is the Key to Viability — Blog 2: Why DfMA? Design for manufacturing and assembly (DfMA) is a revolutionary approach to construction that is poised to reshape the economics of the global construction industry in the coming years. Image:...
by Pekka Moilanen | Jan 31, 2023 | Blog Post
The Facts About Off-site Construction — Blog 5: Cross-laminated Timber A 2020 Vox article written by David Roberts summarized the rationale for the interest, excitement, and even irony in cross-laminated timber (CLT) building systems: “Architects, builders, and...
by Pekka Moilanen | Jan 4, 2023 | Blog Post
The Facts About Off-site Construction — Blog 4: Hybrid Construction Systems The previous two blogs of this series focused on panelized and volumetric modular off-site construction, which are among the most widely adopted approaches to off-site construction around the...
by Pekka Moilanen | Nov 17, 2022 | Blog Post
The Facts About Off-site Construction — Blog 3: Volumetric Modular Construction In this third blog of my series about off-site construction, I’ll discuss volumetric modular construction systems. This approach involves manufacturing 3D modules off-site and then...
by Pekka Moilanen | Oct 12, 2022 | Blog Post
The Facts About Off-site Construction — Blog 2: Panelized Construction In the initial blog of this series, I introduced off-site construction and some of the more widely used approaches for residential and commercial applications. In this blog, I’ll focus on panelized...
by Pekka Moilanen | Sep 20, 2022 | Blog Post
The Facts About Off-site Construction – Blog 1: Introduction Many people think all construction projects fall into two categories: site-built one piece at a time, or manufactured and delivered as a completed structure. However, there is an increasingly...
by Pekka Moilanen | Aug 9, 2022 | Case Study, Cold-Formed Steel Framing
Modular home builder Uniplan Group invests in prefabrication software to align with company’s growth In recent years, speed has become the name of the game for businesses worldwide. From on-demand services to same-day delivery, efficiency is driving customer...
Recent Comments